How Many CTs Do You Need? Single-Phase and Three-Phase Metering Explained

Single-phase needs one CT, a three-phase four-wire meter needs three. Learn how to size and order them correctly.

The number of CTs you need depends on the supply system and the meter, not on the size of the load. Here is a quick guide for the connections found in most Indian LT panels.

Supply and meterCTs requiredNotes
Single-phase, 2-wire1Fit the CT on the phase conductor.
Three-phase, 4-wire (415V, with neutral)3One CT on each phase. This is the usual LT panel arrangement.
Three-phase, 3-wire (no neutral)2 or 3Two-element metering uses two CTs, but three CTs are often used for simplicity.

Three-phase, four-wire systems: three CTs

Most LT distribution boards are three-phase, four-wire. The meter measures each phase separately, so you fit one CT on each phase conductor (R, Y, B). The neutral does not need a CT for energy metering. All three CTs must have the same ratio, class and burden, and face the same direction.

How to size them

Size the CTs for the highest phase current, using the method in how to choose a CT ratio. For example, a 100A three-phase feeder uses three 100/5A CTs, and a 200A feeder uses three 200/5A CTs. Where the LTCT meter needs Class 0.5, use three 100/5A LTCTs or three 200/5A LTCTs instead.

What about earth fault and neutral monitoring?

Earth-fault or residual-current protection uses a different arrangement, a core-balance CT through which all the phase conductors (and neutral) pass together, and it is connected to a protection relay. It is not interchangeable with the metering CTs described here.

Ordering checklist

  • Number of CTs (for example 3 for a three-phase, four-wire meter).
  • Ratio, for example 200/5A, and secondary current (5A or 1A).
  • Window size and whether the conductor is cable or busbar (see ring vs tape wound vs square CTs).
  • Accuracy class and rated burden. For an LTCT energy meter, three matching LTCTs in Class 0.5 or 1.0 are the usual choice.

Tell us your system and meter on WhatsApp and we will confirm the CTs and quote them.

Frequently Asked Questions

How many CTs are needed for a three-phase four-wire meter?

Three, one on each phase conductor. The neutral does not need a CT for energy metering. All three CTs should have the same ratio, class and burden.

Can I use one CT for a three-phase load?

No. A single CT measures only the phase it surrounds. A three-phase meter needs a CT on each phase, apart from two-element connections on three-wire systems.

How do I size CTs for a three-phase feeder?

Size them for the highest phase current, then choose the nearest standard ratio at or above it. For a 100A feeder, three 100/5A CTs are typical.

Is a metering CT the same as an earth-fault CT?

No. Earth-fault protection uses a core-balance CT that encircles all conductors and feeds a relay, while a metering CT surrounds one phase and feeds a meter.

Need help choosing? Contact our factory sales desk or message us on WhatsApp (+91 78360 04040) (opens in new tab).

Tags: #CT for three-phase meter #three-phase CT connection #how many CTs #LT panel metering #CT ordering
Share this Technical Guide

Help fellow switchgear engineers and electrical panel designers

Need CTs Built to These Technical Specifications?

Consult with our engineering team for custom current transformers and wholesale panel solutions.